A concept earns each gate with a measurement. The gate names the artifact and the condition that stops the work.

Gates

  • G0
    Concept note. The capability, the problem and the question are written down.
  • G1
    Model. A deterministic model of the core decision, automated tests, and a bench plan with instruments and quantities.
  • G2
    Bench rig. A rig on synthetic or recorded data, with a measured baseline and stated uncertainty.
  • G3
    Measured prototype. A prototype measured against a stated requirement, with its limits written down.
  • G4
    External review. An outside reviewer or a second team reproduces the result, and the result is published.

The four questions

A concept must answer yes to all four before it gets a repository.

  1. Physics. The effect is allowed by known physics.
  2. Body. The first prototype is handheld, wearable or benchtop. No implant.
  3. Clinic. The first measurement needs no clinical trial.
  4. Money. The first rig fits on two benches.

Evidence

Every result that leaves a project is a record with four parts: the artifact and its SHA-256 hash, the engine and its version, the command that reproduces the run, and the limits. A clean run is not proof of safety, and the record says so.

Limits we keep

  • -
    No weapons, targeting, payloads or combat use.
  • -
    No human implant. Every project is wearable, handheld or benchtop.
  • -
    No medical claim. A health-adjacent project produces a triage prompt, not a diagnosis.
  • -
    No live target. Testing uses owned equipment, synthetic data or consenting adults under a written protocol.
  • -
    Every actuator has a mechanical stop. Every autonomous agent has a kill switch that does not depend on the agent.